J. JAY VIDASResume, Page 1 J. Jay Vidas
136 Ranger Creek Road │ Boerne, Texas 78006 (720) 530-7347 │ jayvidas1@aol.com | www.linkedin.com/in/jayvidas1 Planning & Scheduling Analyst IV
Highly versatile, innovative, and results-driven Planning &
Scheduling Analyst with over 24 years of hands-on experience in the
Engineering, Procurement, and Construction (EPC) arenas. Proven,
successful track-record of scheduling, integrating, managing, and maintaining
high-level construction projects in a timely and effective manner.
Eclectic and vast background and skill-set allows for the seamless transition
between diverse technological sectors and industries. Expert
collaboration abilities yield fantastic long-lasting relationships with
clients, contractors, and government agencies.
Professional Experience
Black and
Veatch Corporation2011 – 2015 Project
Controls Specialist / Scheduler § Developed and executed the first fully integrated EPC
resource loaded level 4 master schedule at Duvha and Kriel power stations in
the Republic of South Africa. §
Successfully
transitioned all outage schedules from standalone P6 and Microsoft Project
versions to a web based Primavera P6 version 8.1., which marked the first
time Eskom senior management could view real time schedule data at the Kriel
power station from their remote offices in Johannesburg, South Africa. §
Served
as team leader in facilitating schedule interfaces between engineering,
procurement, and construction. § Ensured project plans were developed and rolled out in a
proactive, effective, and timely manner in line with industry and corporate
outage management principles. § Ensured project risks were identified and appropriate
control measures put into place and acted upon safely and efficiently. § Prepared and utilized the first Outage Control Center
(OCC) at a coal fired Power Station from which the outages were coordinated,
activities tracked, barriers to success were eliminated, and issues were
escalated, tabled, and resolved to achieve outage milestones and goals. § Coached and mentored the client’s ten trainee planners in
scheduling techniques and tools, primarily using Primavera Project Manager P6
in order to fully integrate numerous contractor schedules into a single
master schedule. § Through thorough service, developed an excellent working
relationship with stakeholders and customers. URS Corporation2006 – 2011 Field
Project Controls Manager / Scheduler § Created and maintained fully integrated level 3 resource
loaded EPC schedules for new construction within the power, petroleum, and
petrochemical industries in California, Illinois and Colorado. Also worked on
government sponsored projects to remediate nuclear contaminated facilities
being decommissioned, dismantled, and demolished in New York. § Employed strong leadership abilities with excellent
communication and decision making skills to coach contractors with schedule
work-around development and mitigation plans. § Led the supervision and oversight of project’s EPC
contractor project controls services. § Assisted cost control personnel with Data migration to and
from Prism, Excel, and Primavera. § Provided in-depth schedule performance visibility to
owners, management, and project teams through metrics, reports, and
briefings. § Successfully supervised small teams in order to provide
cost control, quantity surveys, and estimating. § Participated in walk downs with project engineers to
confirm that piping matched Isometrics and P&ID’s in preparation of
scheduled hydro tests. § Developed mitigation plans to solve construction issues
that affected the goals and objectives of projects. § Served as Lead Scheduler for Power and Distribution
Projects for over a year under extreme and harsh conditions while at Camp
Victory and The Green Zone in Baghdad, Iraq. Tetra Tech EC,
Inc.2005 – 2006 Project
Controls Engineer § Created and maintained the EPC schedules for an average of
ten commercial building construction projects on a monthly basis for the
Air Force Center for Engineering and the Environment (AFCEE) projects in
the United States, Guam, and Iraq. § Assisted the project controls manager and the cost
engineer with the corporate cost reporting. § Worked effectively with cross functional teams on multiple
projects in Iraq simultaneously from the Lakewood, CO office. Amigo Building
Corporation / JT Construction Co., Inc.2001 –
2004 Assistant
Project Manager / Project Scheduler § Developed and maintained level 3 detailed EPC cost loaded
schedules on multiple commercial construction projects for the Air Force
Center for Engineering and the Environment (AFCEE), Department of Defense
(DOD), and the Department of Energy (DOE) projects in Texas. . § Projects consisted of new construction, renovation and
repairs of hospitals, dormitories, hangars, storage buildings, shelters, and
schools. § Provided accurate and thorough cost estimating assistance
to owners and management as required. § Served as liaison between customers and cross functional
groups to provide continuity and collaboration to meet project goals. Onyx
Engineering, Inc.2000 – 2001 Project
Cost / Scheduler § Developed and maintained an EPC project schedule on
a new Amine Unit at Valero Oil Refinery in Corpus Christi, TX § Provided estimating assistance when needed. Zachry
Construction Corporation 1999 – 2000 Project
Controls Representative § Maintained all Civil and Structural database management
and installed quantity curves at a BASF/FINA, Steam Cracker project in Port
Arthur, TX. Project Time
and Cost1998 – 1999 Cost
Engineer / Estimator § Estimated the decontamination, decommissioning and
destruction project for DOE / Safe Sites of Colorado's Plutonium
Stabilization and Packaging System (PUSPS) Project at Rocky Flats
Environmental Technology Site Kloppenberg
& Company1992 – 1998 Project
Manager / Estimator § Prepared estimates and managed custom stainless steel
fabrication projects on restaurants, universities, laboratories, hospitals,
airports, stadiums, and residential. § Convinced the owner to convert to a computerized
estimating system and assisted in its development Seguro Project
Services1991 – 1992 Proposal
Coordinator / Cost Estimator / Schedule Analyst § Prepared estimates and schedules for various commercial
building and residential construction proposals. § Installed overhead cranes in the Denver Mint. Education & Credentials
Diploma, Aurora Central High School, Aurora, CO Member of AACE International, the
Association for the Advancement of Cost Engineering International Certified Scheduling Technician (CST) Certification in Progress Primavera Project Management (P3 and P6 v6 – 8.1), Claim Digger,
Microsoft Project, Microsoft Office Suite MILITARY EXPERIENCE Intelligence Operations Specialist, United
States Air Force Reserve, 1991-1998 Intelligence Operations Specialist, United
States Air Force, 1987-1991 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|